One-Stop Solution: Design, Manufacture, Ship - All Under One Roof

Sourcing wire mesh material handling products from overseas shouldn't mean managing five different vendors, chasing updates, and worrying about what arrives at your port. At ESWIRES, one point of contact covers everything - custom design, steel production, quality control, customs clearance, and international freight - delivered to over 50 countries since 1995.

No middlemen. No outsourcing. Just a 30-year factory with a direct line to your project.

 

Production QC Shipping

 

What "One-Stop" Actually Means at ESWIRES

Most suppliers use the phrase. Few can back it up. Here is exactly what we handle on your behalf - and how long each stage takes.

 

Step 1 - Requirements & Solution Design

Typical timeline: 1 - 3 business days

Send us your application requirements - product type, load capacity, storage environment, pallet size, industry - and our engineering team responds with 2 - 3 solution options within 24 hours. We don't send a generic catalog. We ask the right questions:

What are you storing? (Weight per pallet, item fragility, SKU count)

How is it moved? (Forklift, hand truck, conveyor)

What environment? (Indoor/outdoor, cold storage, corrosive exposure)

Any compliance or certification requirements?

Once requirements are confirmed, we produce technical drawings in AutoCAD format. You review, request changes, and we revise - typically within one business day per revision round. Production does not begin until you sign off on the final drawing.

What you get: Dimensioned technical drawing, material specification sheet, and a fixed production quotation.

 

Step 2 - Factory Production

Typical timeline: 20 - 35 days (standard orders)

Our 100+ person production team works across dedicated lines for:

Wire mesh welding and forming

Steel frame fabrication and bending

Surface treatment (powder coating / electro-galvanizing / hot-dip galvanizing)

Assembly, folding mechanisms, and caster fitting

Production capacity: We operate multiple high-frequency welding machines and automated wire straightening lines, supporting a monthly output of hundreds of container units across standard and custom configurations.

OEM & ODM: Your logo, custom colors, modified dimensions - all handled in-house with no tooling surcharges for most standard modifications.

Sample policy: For new product lines or large custom orders, a pre-production sample can be manufactured and shipped for your approval before mass production begins.

 

Step 3 - In-Process & Pre-Shipment Quality Control

Embedded throughout production - not added at the end

Our QC team is present at every production stage, not just at the final inspection gate. Key checkpoints include:

Stage What We Check
Raw material intake Mill certificate, wire diameter tolerance, surface condition
Welding Weld penetration, bead consistency, joint strength
Forming & assembly Dimensions vs. approved drawing, fold/unfold mechanism, load test
Surface treatment Coating thickness (magnetic gauge), adhesion test, visual uniformity
Pre-shipment Final dimensions, quantity count, surface inspection, packaging integrity

 

Step 4 - Export Packing, Loading & Export Customs Declaration 

Typical timeline: 2–3 working days

Once products pass final inspection, our logistics team takes over:

The products will be packed and loaded into containers.

Full export documentation prepared: Commercial Invoice, Packing List, Bill of Lading, Certificate of Origin, and any additional certifications required by your destination country (fumigation certificate, phytosanitary certificate, etc.)

Customs declaration filed from Xiamen Port - one of China's major export ports with direct services to major global destinations

We ship FOB Xiamen as standard. CIF and other Incoterms are available on request.

 

Step 5 - International Freight & Delivery Tracking

Typical sea freight transit: 15–45 days depending on destination

Destination Region Estimated Transit Time

Southeast Asia 7–15 days

Middle East 15–25 days

Europe (major ports) 25–35 days

North America (West Coast) 18–28 days

North America (East Coast) 28–38 days

Australia / New Zealand 15–25 days

South America 30–45 days

We work with established freight forwarders and shipping lines to secure competitive rates and reliable schedules. Shipment tracking details are shared as soon as the container is loaded.

Air freight is available for urgent sample shipments or small-volume orders where lead time is the priority.